In 2021, Crystal Technology completed a large-scale IT equipment and air conditioning supply project for the Directorate General of Medical Education (DGME), covering seven medical colleges across Bangladesh. This initiative strengthened the educational and administrative infrastructure at these institutions through modern computing equipment and climate-controlled environments.
The seven beneficiary medical colleges — Magura, Mugda, Netrokona, Nilphamary, Chandpur, Sheikh Hasina, and Habiganj — each received tailored equipment packages based on their specific departmental needs and facility requirements. Many of these colleges are relatively newer institutions where foundational IT infrastructure was critical for establishing digital academic and administrative operations.
Crystal Technology managed the entire supply chain from procurement to delivery, installation, configuration, and handover at all seven locations, coordinating logistics across geographically dispersed sites to meet DGME's project timelines.
| Client | Directorate General of Medical Education (DGME) |
|---|---|
| Locations | Magura, Mugda, Netrokona, Nilphamary, Chandpur, Sk. Hasina, Habiganj MC |
| Year | 2021 |
| Status | Completed |
| Domain | IT Equipment & Infrastructure Supply |
| Scale | 7 Medical Colleges |
Procurement and delivery of desktop computers, monitors, keyboards, and mice for administrative offices, faculty rooms, computer labs, and examination departments at all seven medical colleges.
Supply of split and cassette-type air conditioning units for server rooms, examination halls, administrative offices, and lecture theatres to create optimal working and learning environments.
On-site installation and configuration of all computing equipment including operating system setup, network connectivity, printer integration, and air conditioning unit mounting and commissioning at each college.
Rigorous pre-delivery quality inspection and testing of all equipment to ensure compliance with DGME specifications, including hardware benchmarking, AC cooling capacity verification, and warranty documentation.
Coordinated delivery and deployment across seven geographically dispersed medical colleges throughout Bangladesh, managing transportation, on-site handling, and installation scheduling to meet project deadlines.
Formal handover of all installed equipment to each medical college administration with complete asset inventory documentation, warranty cards, user guides, and maintenance instructions for institutional record-keeping.